PROJECT ČÁMOVKA – 2nd phase
The Čámovka project’s second phase follows up on the successful completion of stage 1 in 2013. Not only does it offer the same level of architectural quality, but it also preserves or even improves on the use of a quiet zone in the centre of the buildings. Located near the Čimice Valley nature reserve, stage 2 consists of another 148 units ranging in size from studios (1+kk) to four-bedroom apartments (5+kk). The units are designed down to the last detail on the basis of Čámovka’s current inhabitants and the wishes of new clients.